
Data Centre Decommissioning
Discuss the electrical waste collection element of a data centre decommissioning project.
Request a collection quoteElectrical waste collections for data centre projects
Our electrical waste collection service supports the collection element of data centre decommissioning projects, covering retired racks, power distribution units, switches and associated hardware. These projects can involve dense equipment loads, staged clearances and restricted loading areas. Share an equipment schedule, approximate dimensions and access information so our team can review the WEEE collection requirements separately from any dismantling, data destruction or wider decommissioning work.
Data centre clearances can combine dense racks, servers, network hardware, UPS equipment and cable. We discuss the WEEE collection element around the project’s equipment schedule and site constraints.

Examples for collection
This list is not exhaustive. Tell us about other electrical items in the same load and our team can review them together.
- Server racksFrames and cabinets cleared when an equipment room is emptied.
- PDU unitsRack power distribution units withdrawn alongside the equipment they fed.
- Chassis-based switchesModular switches removed from network cores and aggregation points.
- Patch panelsCopper patch fields stripped out during a cabling clearance.
Scope the data centre equipment removal
Share the asset schedule
List racks, servers, switches, power equipment and cable, with quantities and approximate dimensions.
Review the site logistics
Identify floors, loading bays, lifts, security controls and whether equipment has already been disconnected.
Coordinate collection
The agreed waste equipment is collected in line with the confirmed project scope and access plan.
Different routes for mixed infrastructure equipment
We arrange onward recycling and treatment based on the electrical waste being collected and your location.
A data centre load may contain reusable assemblies, metal-rich equipment, batteries, cable and data-bearing media. Each stream is reviewed according to its type and the arrangements agreed for the project.
The importance of recycling data centre equipment
Data centre clearances produce large volumes of metal-rich equipment, cable, power units and electronics. Recycling these materials at scale conserves resources and ensures redundant infrastructure is handled through appropriate recovery routes rather than landfill.
Discuss your data centre decommissioning requirements
Tell us what needs collecting from your business. Our team will review the equipment, quantities and location before discussing collection arrangements.
Data Centre Decommissioning FAQs
What equipment comes out of a data centre clearance?
Typically servers, storage arrays, network switches, racks, UPS systems, batteries, cabling and power distribution units.
Does hardware need to be de-racked beforehand?
State whether equipment is still installed, de-racked or consolidated. This helps our team understand the work involved.
Can large or multi-site projects be discussed?
Yes. Share equipment volumes, site locations and timescales so the project scope can be reviewed with our team.